用于全设施数据中心基础设施规划的工作负荷功率简介
Measurement of Generative AI Workload Power Profiles for Whole-Facility Data Center Infrastructure Planning
作者
Authors
Roberto Vercellino | Jared Willard | Gustavo Campos | Weslley da Silva Pereira | Olivia Hull | Matthew Selensky | Juliane Mueller
期刊
Journal
暂无期刊信息
年份
Year
2026
分类
Category
国家
Country
-
📝 摘要
Abstract
The rapid growth of generative artificial intelligence (AI) has introduced unprecedented computational demands, driving significant increases in the energy footprint of data centers. However, existing power consumption data is largely proprietary and reported at varying resolutions, creating challenges for estimating whole-facility energy use and planning infrastructure. In this work, we present a methodology that bridges this gap by linking high-resolution workload power measurements to whole-facility energy demand. Using NLR's high-performance computing data center equipped with NVIDIA H100 GPUs, we measure power consumption of AI workloads at 0.1-second resolution for AI training, fine-tuning and inference jobs. Workloads are characterized using MLCommons benchmarks for model training and fine-tuning, and vLLM benchmarks for inference, enabling reproducible and standardized workload profiling. The dataset of power consumption profiles is made publicly available. These power profiles are then scaled to the whole-facility-level using a bottom-up, event-driven, data center energy model. The resulting whole-facility energy profiles capture realistic temporal fluctuations driven by AI workloads and user-behavior, and can be used to inform infrastructure planning for grid connection, on-site energy generation, and distributed microgrids.
📊 文章统计
Article Statistics
基础数据
Basic Stats
94
浏览
Views
0
下载
Downloads
23
引用
Citations
引用趋势
Citation Trend
阅读国家分布
Country Distribution
阅读机构分布
Institution Distribution
月度浏览趋势
Monthly Views